On behalf of Turbinova AS, CEDI has installed two integrated Turbosets in South in Poland during the Spring 2011.
There were installed 2x 75kW units with automation and control system. The hydropower plant is operating from 4 months already!
The turbine is designed according to a principle of individual adaptation to natural conditions.
Realised projects

Latest news
Two 75 kW turbines to South...
Two 75 kW turbines to South of Poland (Lower Silesia )
On behalf of Turbinova AS, CEDI has...