Jump to content

Home › Realised projects

Contact

Realised projects

On behalf of Turbinova AS, CEDI has installed two integrated Turbosets in South in Poland during the Spring 2011.

There were installed 2x 75kW units with automation and control system. The hydropower plant is operating from 4 months already!

The turbine is designed according to a principle of individual adaptation to natural conditions.




Latest news

Two 75 kW turbines to South...

Two 75 kW turbines to South of Poland (Lower Silesia ) On behalf of Turbinova AS, CEDI has...
More »